Welcome To HeBei KaiJin Machinery Equipment Co., Ltd.    Tel:+86-311-89159591

凯金02
凯金02

凯金02

凯金01
凯金01

凯金01

NEWS

News

Under the new economic norm, the Chinese mining industry economics is in climbing over the ridge of the key nodes, into the "brighter" retreat, "all bets are off." Some members of the NPC of China's mining industry should adhere to the reform and transformation of the "two wheel drive" strategy, the government should power, "subtraction", in exchange for the vitality of the market multiplication
Mineral resources are in the earth's crust, which can be developed and utilized in accordance with the geological law. The distribution of mineral resources in the world
The mud pump mud from pulp pool through the mud pipe pump is directly sent to the pile tip. The mud with slag from pile mouth to gush, flow into the mud pool through the mud ditch, filtered then pump into the pile tip, which is the normal circulation of the pile machine cycle.
Carry the role: drilling fluid circulation, through its own cycle, the bottom is broken drill bit cuttings carried to the ground, to keep borehole cleaning, drill from the unimpeded and ensure drill bit at the bottom always contact and break new ground, not caused by repeated cutting, keep safe and fast drilling.
to strengthen the exploration of "green" concept
-
-
-
Rules for the use of open hole drills

News center

Rules for the use of open hole drills

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2017-12-06
  • Views:0

(Summary description)

Rules for the use of open hole drills

(Summary description)

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2017-12-06
  • Views:0
Information

Safety operation, no matter in which industry is the primary knowledge before using DTH drill should also keep in mind the DTH drill using rules, avoid all exist safety hidden trouble, safe use of DTH drill, first of all to the DTH drill for installation and preparation.

Before using the drill, there should be a check before the drill:

1. When starting work, check to see if the gas water pipe line is connected securely, and there is no leakage.

2. Check whether the oil is filled with oil.


3. Check whether the screws, nuts and joints of the parts have been tightened, and whether the columns are really strong.


When opening the hole, start the motor first, and then push the hand handle of the trigger manipulator.
Give it the proper propulsion and then pull the hand of the control shock to the position of work.
After drilling, the water valve can be opened and the mixture of air and water is kept in a proper proportion.
Perform normal drilling.

Keyword:

Scan the QR code to read on your phone

Mobile official website
Copyright © 2022 HeBei KaiJin Machine Equipment Co., Ltd.